GLOBAL E-TAILER
GLOBAL E-TAILER HIGH-RISE BUILDING, PHASE I
The project, fast-tracked, encompassed the interior strip-out of all finishes, including walls, flooring, and ceilings. Significant floor prep/float removal and ceiling nit-pick for the pre-manufactured ceiling system.
The project covered a substantial area of 80,000 SF, on the 30th through 34th floors.
Location: Downtown Seattle, Washington
General Contractor: Sellen Construction
Recycling Summary: 141 tons of waste diverted from landfill
Unique Challenges: The project encountered distinctive hurdles, such as a tight schedule and limited load-out hours. To meet the owner's tight timeline, our team worked nonstop for 28 days to remove four entire floors. Moreover, due to strict building rules, we had only three to four hours per shift for debris removal, requiring extensive coordination to optimize weekend load-out times.

LET'S GET STARTED
Cleaner. Safer. Faster.
MAIN OFFICE
3310 Chestnut St
Everett, WA 98201
(425) 339-3111
SATELLITE OFFICES
Tacoma, WA (425) 339-3111
Spokane, WA (509) 315-9934